[1]
2023. PERBANDINGAN RENCANA ANGGARAN BIAYA MENGGUNAKAN METODE BOW, SNI 2008 DAN AHSP 2022 (STUDI KASUS: PROYEK PEMBANGUNAN MASJID DPRD PROVINSI SUMATERA BARAT). Jurnal Applied Science in Civil Engineering. 4, 4 (Dec. 2023), 404–408. DOI:https://doi.org/10.24036/asce.v4i4.88583.