[1]
Azmi, Y. and Arifin, A. 2024. ANALISIS EFEKTIVITAS WAKTU DAN BIAYA PENAMBAHAN JAM KERJA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK RUSUN KOTA BUKITTINGGI. Jurnal Applied Science in Civil Engineering. 5, 2 (Jun. 2024), 252-259. DOI:https://doi.org/10.24036/asce.v5i2.106083.