(1)
ANALISIS EFEKTIVITAS WAKTU DAN BIAYA PENAMBAHAN JAM KERJA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK RUSUN KOTA BUKITTINGGI. ASCE 2024, 5 (2), 252-259. https://doi.org/10.24036/asce.v5i2.106083.