(1)
ANALISIS PRODUKTIVITAS ALAT BERAT WIRTGEN DALAM PENGENDALIAN WAKTU PADA PEKERJAAAN RIGID PAVEMENT (STUDI KASUS: PROYEK PEMBANGUNAN JALAN TOL SEKSI PADANG - SICINCIN). ASCE 2024, 5 (2), 167-172. https://doi.org/10.24036/asce.v5i2.106183.