Azmi, Y., & Arifin, A. (2024). ANALISIS EFEKTIVITAS WAKTU DAN BIAYA PENAMBAHAN JAM KERJA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK RUSUN KOTA BUKITTINGGI. Jurnal Applied Science in Civil Engineering, 5(2), 252-259. https://doi.org/10.24036/asce.v5i2.106083