“EVALUASI FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTRUKSI JALAN PROVINSI DI RUAS PASAR BARU – ALAHAN PANJANG”. 2022. Jurnal Applied Science in Civil Engineering 3 (3): 234-39. https://doi.org/10.24036/asce.v3i3.52083.