“EVALUASI FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTRUKSI JALAN PROVINSI DI RUAS PASAR BARU – ALAHAN PANJANG” (2022) Jurnal Applied Science in Civil Engineering, 3(3), pp. 234–239. doi:10.24036/asce.v3i3.52083.