“ANALISIS EFEKTIVITAS WAKTU DAN BIAYA PENAMBAHAN JAM KERJA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK RUSUN KOTA BUKITTINGGI” (2024) Jurnal Applied Science in Civil Engineering, 5(2), pp. 252–259. doi:10.24036/asce.v5i2.106083.