Alperi, I. and Zola, P. (2022) “ANALISIS BIAYA PERUMAHAN KAMPUNG BARU PERMAI MENGGUNAKAN ACTUAL COST”, Jurnal Applied Science in Civil Engineering, 3(1), pp. 23-26. doi: 10.24036/asce.v3i1.342566.