[1]
“EVALUASI FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTRUKSI JALAN PROVINSI DI RUAS PASAR BARU – ALAHAN PANJANG”, ASCE, vol. 3, no. 3, pp. 234–239, Oct. 2022, doi: 10.24036/asce.v3i3.52083.