(1)
IMPLEMENTASI BUILDING INFORMATION MODELING (BIM-5D) PADA ANALISIS CLASH DETECTION DAN PERHITUNGAN MUTUAL CHECK 0% (MC 0%) PROYEK PEMBANGUNAN POLDER SUNTER C (STUDI KASUS: PEMBANGUNAN POLDER POMPA KBN, SUNTER C, GREENVILLE (RW13), DAN IKPN BINTARO). ASCE 2025, 6 (2), 212-217. https://doi.org/10.24036/asce.v6i2.126283.