ANALISIS KONFLIK URUTAN KERJA DAN PENJADWALAN RENOVASI BANGUNAN EKSISTING MENJADI RESTORAN MENGGUNAKAN METODE CPM(STUDI KASUS: PEMBANGUNAN RESTO TIAKAR KOTA PAYAKUMBUH). (2026). Jurnal Applied Science in Civil Engineering, 7(4), 407-415. https://doi.org/10.24036/5bac2t02