IMPLEMENTASI BUILDING INFORMATION MODELING (BIM-5D) PADA ANALISIS CLASH DETECTION DAN PERHITUNGAN MUTUAL CHECK 0% (MC 0%) PROYEK PEMBANGUNAN POLDER SUNTER C (STUDI KASUS: PEMBANGUNAN POLDER / POMPA KBN, SUNTER C, GREENVILLE (RW13), DAN IKPN BINTARO). Jurnal Applied Science in Civil Engineering, [S. l.], v. 6, n. 2, p. 212–217, 2025. DOI: 10.24036/asce.v6i2.126283. Disponível em: https://asce.ppj.unp.ac.id/index.php/ASCE/article/view/1262. Acesso em: 24 apr. 2026.