“IMPLEMENTASI BUILDING INFORMATION MODELING (BIM-5D) PADA ANALISIS CLASH DETECTION DAN PERHITUNGAN MUTUAL CHECK 0% (MC 0%) PROYEK PEMBANGUNAN POLDER SUNTER C (STUDI KASUS: PEMBANGUNAN POLDER POMPA KBN, SUNTER C, GREENVILLE (RW13), DAN IKPN BINTARO)”. 2025. Jurnal Applied Science in Civil Engineering 6 (2): 212-17. https://doi.org/10.24036/asce.v6i2.126283.