[1]
“ANALISIS KONFLIK URUTAN KERJA DAN PENJADWALAN RENOVASI BANGUNAN EKSISTING MENJADI RESTORAN MENGGUNAKAN METODE CPM(STUDI KASUS: PEMBANGUNAN RESTO TIAKAR KOTA PAYAKUMBUH)”, ASCE, vol. 7, no. 4, pp. 407–415, Nov. 2026, doi: 10.24036/5bac2t02.